
ML-102

Features
Limited Lifetime Shingles
IKO Cambridge Architectural shingles are a heavy-weight shingle engineered to withstand the elements.
30 Year Warranty on Windows
Kohltech Windows are custom crafted to add beauty, security, comfort and energy efficiency to your home.
High Quality Designer Cabinets
Give your kitchen personality by choosing from a nearly endless selection of styles, wood types and colour combinations.
Kiln Dried Lumber
Kiln drying allows for the tight control of air flow, temperature and humidity for a stronger, better quality wood.
Plywood Floor and Wall Construction
Durable plywood flooring and exterior wall sheathing is installed for maximum strength and a tight, long lasting construction
Wood Interior Trim
Interior trims are made from solid wood with no MDF providing a dignified and handcrafted feel to your home
Energy Efficient
All homes are built to meet or exceed energy efficiency requirements of local building codes.
Limited Lifetime Warranty on Siding
Mitten Siding has a classic selection of exterior design solutions in a wide range of colour choices.
1 Year Manufacturer Warranty
We stand behind our homes and offer all customers a 1 year warranty against defects in materials and workmanship.
10 Year Structural Warranty Available
We offer an additional structural warranty that is available in applicable regions.



